One thing I have l received in the last year about central heating plus air conditioning system units is to never crank them at their top capacity! Not that anyone would want to do that, but when your central heating plus air conditioning system proposal breaks down, a lot of people try to turn the control component to the max to see what it would do. This could easily end up killing your central heat plus a/c component plus make it burn out. I l received this when I ended up doing exactly that the last time our heating plus air conditioning system proposal had an issue. When the certified heat plus a/c specialist from the local heating plus air conditioning system company came to look at the broken down Heating, Ventilation plus A/C proposal unit, they said that I needed a whole new heat plus a/c system. They then asked me if I cranked the control component all the way down or up, plus when I told them I did, they said that had I not done that, he would have been able to service our central heating plus air conditioning system unit. As at first, all it happened to be was a blown out fuse. Now, because I cranked the control component all the way down, it blew out the entire motor of the central heating plus air conditioning system proposal and the circuits! So now it is dead. The only solution is a brand new heating plus cooling unit. So I l received our lesson plus l received it hard. Never crank the control component of the central heating plus cooling proposal unit!
Leave a Reply